*Price of raw material per kg/l:
*Daily production (prepackages):

qty.

*Nominal filling amount:
*Production days in a year:

Days

*Average filling amount:
*Machine standard deviation:
*Needed overfilling:

due to product/process

Target filling amount:
Average overfilling per prepackage:
Overfilling per day:
Overfilling a year:
Cost of overfilling per annum:
*Saving of time per day:

due to allocation of inspections from the laboratory to the production line

h.

*Saving of time per day:

due to omission of manual transmission of results

h.

*Saving of time per day:

due to omission of manual archiving

h.

*Saving of time per day:

due to immediate evaluation by "keystroke"

h.

Total saving of time per annum:

h.

*Cost of working hour (h):
Cost reduction due to saving of time:
*Other savings:

e.g. paper costs

*System price:
Possible savings per annum:

Amortisation time:

Months